Skip to content
American Contracting & Consulting
Premier Concrete and Roofing Contractors
Concrete
Hail & Storm Repair
Exterior Services
Roofing
Gutters
Siding & Painting
General Contracting
Portfolio
Articles & Tips
About
Employment
Contact
Request Services: 605-644-6447
Menu
Concrete
Hail & Storm Repair
Exterior Services
Roofing
Gutters
Siding & Painting
General Contracting
Portfolio
Articles & Tips
About
Employment
Contact
Concrete Pour Form
Your Full Name
(Required)
Name of Employee Filling out form
Your Email
(Required)
Enter Your Email to send a copy of your record to
Job Name
(Required)
Please Ensure Job Name You enter corresponds to what is in your timeclock software (quickbooks)
Date
(Required)
Enter Date Pour Occured
MM slash DD slash YYYY
Mud Ordered Amount (Yards)
(Required)
Pre Pour Mud
(Required)
Measurments Taken To ensure Correct mud amount is ordered
Checked Daily Weather Conditions
Pour Type
(Required)
Driveway
Sidewalk
Curb & Gutter
Patio
Interior Floor
Footers
Foundation Walls
Foam Block Walls
Mud Type
(Required)
Interior Mud
Exterior Mud
Finish Type
(Required)
Broomed
Stamped
Power Troweled
Floated (Footers & Foundation Walls)
Calcium Added
If Calcium added enter amount (Please make sure to take pictures of final receipt from concrete company)
Decellerant Added
If Decellerant added enter amount (Please make sure to take pictures of final receipt from concrete company)
Post Pour
Concrete Left Over
(Required)
How much concrete left over not used
Post Pour
(Required)
This is a simple day of Checklist
Hand Tools Cleaned
Screed Plank Cleaned
Garbage Picked Up and Thrown in Trash
Tools Put Away
Jobsite Tidied Up
Trailers Moved out of way of Public Traffic
Trailer Locked
Forms & Stakes
(Required)
Outside of forms and stakes cleaned of excess concrete(makes easier for stripping and unscrewing following day)
Grade Stakes picked up and nails removed(If Relevant to pour type)
Concrete Trailer Condition
(Required)
Describe Concrete Trailer Condition
Satisfactory
Good
Great
Needs Cleaning
Cleaned Concrete Trailer
Yes
No
Power Tools Needing Additional Maintenance Attention
List any tools you think may need additional maintenance and attention before next pour
Pour Report
(Required)
Enter your pour Report. How did the pour go? List any things that went well as well as any challenges that may have occurred and areas for improvement. Professional opinions and Suggestions to improve welcome!
Attach your Photos
(Required)
Upload Photos associated with proving this documents accuracy. Remember to take pictures of prepour, temp gun temperature, Receipt, pictures during and after pour where relevant and any finish items. Please keep photos uploaded to 15 or less. Additional photos for marketing can be shared via other methods.
To view this content, you need to have JavaScript enabled in your browser.
To do so, please follow these instructions
.
Add your files
File
I Consent
(Required)
To The Best of my ability I consent to this forms accuracy and have taken the necessary steps to record accurate information as well as check this informations quality against the final product.
I Consent to this form's accuracy .
Signature
(Required)
Best to sign with your index finger if you are on your phone and do not have a stylus
Initial
(Required)
Enter Your initials
Go to Top